Work Begins On $7 Million-Plus Airport Runway Repair For Santa Barbara Airport

Your browser doesn’t support HTML5 audio

An overnight project to fill cracks and repave the 6000-foot surface of the Santa Barbara Airport's main runway will close the runway from midnight to 6 a.m. daily.

KCLU's John Palminteri reports on the changes to flight schedules as a result.

  • Facebook
  • Twitter
  • LinkedIn
  • Email